As a reliable China manufacturer and factory supplier of high voltage steel pipe transmission tower, Qingdao Anbang New Energy produces round-section power towers for 10kV–750kV overhead transmission lines. Our in-house fabrication workshop supports custom design, precision CNC processing and hot-dip galvanizing for global power EPC buyers.
The high voltage steel pipe transmission tower features uniform steel distribution, good aerodynamic performance and
compact footprint. It is widely selected for urban narrow corridor projects, typhoon-prone coastal zones and new
energy outgoing transmission lines. We support custom design, CNC precision machining, first-piece trial assembly,
third-party witnessing inspection and complete technical document delivery. Send your project parameters and
drawings to get factory quotation within 24 hours.
Round closed cross-section distributes steel evenly around the axis, eliminating weak axis and reducing wind drag
compared with angle lattice tower. It delivers stable structural performance under strong wind and typhoon
conditions. We set diameter-to-thickness ratio based on slenderness and local buckling check, instead of simply
increasing wall thickness; stiffener rings will be applied at door openings and flange positions to control cost
while maintaining rigidity.
Our design output includes tower general arrangement drawing, foundation plate & anchor bolt drawing, segment
marking drawing and erection instruction. We align civil foundation drawing with tower main structure drawing to
avoid version mismatch for your civil contractor.
Parameter
Parameter
Standard Working Range
Custom Range
System Voltage
220kV – 500kV
10kV – 750kV
Structure Height
15m – 80m
10m – 120m
Design Wind Speed
25 – 35 m/s
Up to 50 m/s
Main Steel Grade
Q355B / ASTM A572
Q420B, Q460, S355JR
Surface Treatment
Hot-dip galvanizing to ASTM A123
Galvanizing + powder coating
Connection Type
Flanged bolted joint
Slip joint, site welded splice
Welding Standard
AWS D1.1 / GB 50205
Adjusted to IEC, regional national codes
How is hot-dip galvanizing and anti-corrosion handled for high-salt projects?
Corrosion failure is the top risk for long-term running overhead towers, especially for coastal splash zones, desert
sand scour and humid tropical environments. Anbang shares ownership in a dedicated galvanizing plant, so we control
coating quality and delivery schedule independently, instead of outsourcing to third parties.
All steel plates and welded assemblies go through pre-treatment before galvanizing. For closed tubular sections, we
weld end cap plates and reserve drain holes before final closure; internal coating of the base section is finished
at factory to avoid unreachable hidden corrosion inside tubes after erection. Zinc thickness follows ASTM A123 and
GB/T 13912. For high corrosive marine environments, we offer optional extra powder coating on galvanized surface for
extended service life.
Critical welding components such as stiffener rings and door frames are welded before galvanizing. We avoid field
welding on coated sections, as site repair cannot restore anti-corrosion performance to factory standard.
Lead Time, Packing and Site Lifting Support
Lead time is determined mainly by steel material availability and drawing confirmation. Q355B steel is kept in
regular stock; high-strength grades Q420B / Q460 require special ordering, which extends production cycle.
Each high voltage steel pipe transmission tower is split into transportable segments, normally under 8 m, with
single-piece weight matched to common 25-tonne on-site crane capacity. We supply lifting scheme with
centre-of-gravity marking for each segment to prevent bending during hoisting. All segments are printed with unique
match numbers on both ends; parts are bundled and nested on truck rather than stacked to avoid deformation. Bolts
and small fittings are packed in separate waterproof boxes.
We export through Qingdao port, and can prepare packing, marking and shipping documents for sea freight. For
mountainous sites with narrow access roads, we adjust segment length at quotation stage to fit local transport
constraints.
Before Placing the Order, Please Confirm the Materials
To help us deliver accurate engineering calculation, drawing review and formal quotation within 24 hours, please
prepare below project data:
1. System voltage, tower type (tangent / tension / corner / terminal)
2. Design wind speed, ice load, seismic requirement and local design code
3. Conductor, OPGW parameters, span and deviation angle
4. Terrain condition: urban roadside, coastal, mountain, desert
5. Steel grade, anti-corrosion requirement, preferred connection method
6. Quantity and delivery schedule requirement
7. Foundation restriction or right-of-way limit if available
About Us
Qingdao Anbang New Energy, founded in 2014 and State-Grid approved, manufactures high voltage steel pipe transmission
tower for overhead power transmission.
Our 150,000 m² Jiaozhou production base owns full-chain fabrication equipment and invested hot-dip galvanizing
workshop, certified by ISO 9001, ISO 14001, ISO 45001, ISO 50001.
We hold authoritative test certificates for 220kV, 500kV and 750kV steel tower structures, with export delivery
experience to Asia, Africa and other overseas power markets.
FAQ
Q1: When is a high voltage steel pipe transmission tower better than angle steel lattice tower?
A: Tubular tower is preferred when your corridor space is limited, foundation bearing capacity is weak, or the site
faces high wind / typhoon risk. Its compact base greatly reduces land occupation for urban roadside and densely
populated zones.
Q2: Can you design the high voltage steel pipe transmission tower according to our national standard or IEC?
A: Yes. Our engineers adjust structural calculation, welding specification and inspection requirements to match IEC,
ASTM or your local grid standards. Please share your technical specification at enquiry.
Q3: Do you accept third-party inspection before shipment?
A: We fully support third-party witness inspection, including material check, dimension survey, weld UT test,
galvanizing inspection and trial assembly witnessing. All test records can be released for the inspector.
Q4: Are tower joints bolted on site or field welded?
A: Standard design adopts bolted flange connection or slip joint to minimize field welding. Field welding is avoided
as it brings anti-corrosion repair risk and relies on stable weather conditions. All segments are marked with
matching numbers for easy erection.
Q5: What is your typical production lead time?
A: After drawing confirmation and deposit receipt: Q355B stock steel about 4 weeks; high-strength Q420B / Q460 steel
around 8–10 weeks. Complex multi-circuit or heavy-load towers will be confirmed separately in quotation.
Q6: What is the service life of hot-dip galvanized tubular tower?
A: Under normal atmospheric environment, properly galvanized steel tower can serve 40+ years. For coastal salt-spray
areas, extra coating options are recommended to extend anti-corrosion lifespan.
Anbang is a professional manufacturer and supplier in China. Our factory provides steel pipe tower, signal tower, single arm traffic pole, etc. If you are interested in our products, you can inquire now, and we will get back to you promptly.